Building and Leaving Behind A Legacy of Knowledge

As design-builders, we’re fortunate to be able to leave our mark in this world by the rooms, houses and buildings we design and build for families and future generations.
A Guide on Building Your Dream Home

Just because we’re in the business of design-build, doesn’t mean that we should only tell you the good stuff about it and raise your expectations about building a new home (though many salespeople would definitely disagree with us on this!).
Redwood City – Spacious & Luxurious Single Story

This gem of a house was a design-build project that was focused on creating more space in the home while adding a feel of elegance and luxury to a traditional design.
Redwood City – A Traditionally Modern New Home

Our designer came up with a hybrid design which complemented both the old and new perfectly.
San Jose – Out With The Old, In With The New

More and more owners nowadays are looking for their homes to be transformed into a newer and modern design.
San Mateo – Rustic with a Touch of Modern

Here, a 2 bedroom and 1 bathroom split level house was to be transformed into a 4 bedroom, 3 bathroom, 2 story split level traditional home.
San Mateo – Tastefully Traditional Yet Luxurious

A custom traditional design which our clients were interested in converting a 2 bedroom and 1 bathroom house to a 3 bedroom 2 bathroom house.
Design-Build vs. Design-Bid-Build

With Design-Build, there is no separation of contract between the Designer and Contractor. This method has been gaining more popularity over the traditional method for the past 15 years or so (and we’re not simply saying this because we’re a design-build firm!).
Turnkey? Easy-Peasy

When you opt for Turnkey with us, we get you expert advice and quality work from the best professionals without sacrificing any of your needs and desires. It is, after all, your dream home and we are pleased to be of service.
Planning is the key to success

Whether it’s a remodeling, an addition or a completely new home, depending on the extent of the project, a lot of work and time goes into the Planning Phase as well.